- Email: sales@kuantong.com
- Phone: +886 (0)6β589-2101
- Location: Tainan, Taiwan
From tooling kick-off to final packing. We manage the production complexity so you can focus on the market.
Tooling & DFM
Gate review, DFM feedback, and trial alignment.
Injection
Material traceability and cycle control with SPC sampling.
Finishing
Spray painting & electroplating with adhesion checks.
Assembly & Pack
Snap-fit checks, torque tests, and drop-test verification.
Dive Deeper. Full Equipment List & QA Lab Below.
Showroom Flagship wheel covers
Showroom Lighting lineup
Logistics Loading Yard
80β120T Small clips, caps
160β220T Medium covers
250β350T Wheel covers
400β500T Large parts
Painting Automated line
Plating Chrome finish
drying 24h drying step
Temperature & Humidity Temperature & Humidity Testing Chamber
Auto Temperature & Humidity Delta-E
Salt Spray Corrosion hours
Cross-hatch & Adhesion
ASTM D3359 checks after bake cycles.
Salt Spray
For electroplated parts under specified hours.
Color & Gloss
DeltaβE and gloss meter recording per lot.
Share drawings, target volumes, and cosmetic specs β weβll advise on gate design, finishing options, and packaging for your routes.